Projects

City of London council area. Every figure carries its own date.

Named local schemes and plans, with the responsible body and the latest stage established by the source checked. A proposal, funding announcement and completed project are different things.

Barbican Centre, City of London

Barbican Renewal

New lifts, repairs and better use of public spaces will make the arts centre more accessible while retaining its historic fabric.

Planning permission and listed-building consent approved · evidence dated 2026-03-03

Responsible body: City of London Corporation and Barbican Centre

Latest evidence: The approved first phase includes access improvements, the Conservatory, foyers and lakeside terrace. Major works are planned from 2027, with most activities pausing from June 2028 to 2029.

Next thing to establish: Which neighbourhoods are covered by an official project plan, and which benefits still need testing?

Progress, funding and source
Cost
£231 million stated phase-one requirement.
Funding
£191 million City Corporation commitment; additional fundraising is needed.
Area covered
Unmapped: a verified current ward boundary or council ward statement is still needed.

No verified ward footprint is assigned.

Barbican Renewal plans approved →

Source checked 2026-10-17. A plan or announcement is not proof of completion.

Questions for the next progress report

  • What is the next published milestone, and what evidence will show residents benefit?

Make Barbican renewal accessible through the disruption →

Target support where disadvantages overlap →

How to track delivery →

Salisbury Square, City of London

Salisbury Square police and courts complex

A purpose-built police headquarters and courts will bring together local policing and specialist work on fraud and economic crime.

Police headquarters structure topped out; construction continuing · evidence dated 2026-01-09

Responsible body: City of London Corporation, City of London Police and delivery partners

Latest evidence: The council confirms the topping-out milestone. The wider Salisbury Square development is due to complete in 2027; topping out does not mean the building is occupied.

Next thing to establish: What is the approved cost, including ongoing maintenance?

Progress, funding and source
Cost
Not established by the evidence checked.
Funding
£600 million City Corporation investment in the wider Salisbury Square development, not the police headquarters alone.
Area covered
Unmapped: a verified current ward boundary or council ward statement is still needed.

No verified ward footprint is assigned.

New City of London Police headquarters →

Source checked 2026-10-17. A plan or announcement is not proof of completion.

Questions for the next progress report

  • Which neighbourhoods are covered by an official project plan, and which benefits still need testing?
  • What is the next published milestone, and what evidence will show residents benefit?

Target safety work where problems repeat →

Target support where disadvantages overlap →

How to track delivery →

Eight listed junction locations in the City of London, including Moorgate, Aldersgate Street and Tudor Street

Raised crossings across the Square Mile

Smaller street changes aim to make crossing easier for wheelchair users, people with pushchairs and everyone walking through the City of London.

Delivery planned from October 2026; completion not confirmed · evidence dated 2026-10-05

Responsible body: City of London Corporation

Latest evidence: The programme raises crossing areas to pavement level and adds parking or loading restrictions where needed. The October page lists eight locations for delivery, with Gutter Lane proposals developed separately. This covers the Square Mile, not Greater London.

Next thing to establish: What is the approved cost, including ongoing maintenance?

Progress, funding and source
Cost
Not established by the evidence checked.
Funding
Not established by the evidence checked.
Area covered
No verified current ward footprint is assigned. The named location or council-wide remit does not establish benefits in every ward.

No verified ward footprint is assigned.

Raised crossings across the Square Mile →

Source checked 2026-10-17. A plan or announcement is not proof of completion.

Questions for the next progress report

  • Which funding is committed, and what remains conditional?
  • Which neighbourhoods are covered by an official project plan, and which benefits still need testing?
  • What is the next published milestone, and what evidence will show residents benefit?

Check that crossing improvements remove real barriers →

Plan homes and care around an older population →

Bring support closer to people in poor health →

Target support where disadvantages overlap →

How to track delivery →

What this local evidence covers

3 reviewed plans and projects

3 have a source-dated stage; 2 have some funding evidence; 1 have some cost evidence. These counts do not prove that funding or costs are complete.

Check each project →

0 verified ward links

Project locations cannot be treated as a map of who benefits. Each record explains any verified ward association.

Read the sources and limits →
What is still missing

The reviewed local schemes are a selected evidence collection, not a complete council capital programme.

Current service capacity, incomes, waiting lists, school demand and project outcomes need additional verified local evidence before firm claims can be made.

These projects and statistics must not be presented as covering Greater London. Barbican phase-one fundraising and the Salisbury Square 2027 programme still require monitoring.

Project locations have not yet been checked against current ward boundaries. No ward impact is inferred from a city-centre address.